05
— NEP alignment
Policy sets the destination. Capability decides whether anyone arrives.
Raaj Drishti is designed as the execution bridge from NEP 2020 to NEP 2030 — building the leadership, process excellence and evidence culture Indian institutions need on the road to Viksit Bharat 2047.
An independent initiative. Project Raaj Drishti is a programme of the International Process Excellence Council. It is not a government policy or programme, carries no government endorsement, and does not speak for any ministry or department.
01
— The trajectory
Six decades of policy, and the gap each one left.
01
1968
The first National Policy on Education establishes a national framework.
02
1986 / 1992
The second policy, and its revision, extend access and structure.
03
2020
NEP 2020 sets out an ambitious redesign of school and higher education.
04
2030
The era in which implementation capability, process excellence and evidence culture determine outcomes.
05
2047
Viksit Bharat — the horizon the policy trajectory is aimed at.
01
1968
The first National Policy on Education establishes a national framework.
02
1986 / 1992
The second policy, and its revision, extend access and structure.
03
2020
NEP 2020 sets out an ambitious redesign of school and higher education.
04
2030
The era in which implementation capability, process excellence and evidence culture determine outcomes.
05
2047
Viksit Bharat — the horizon the policy trajectory is aimed at.
The proposition
NEP 2020 provides the vision. Raaj Drishti builds the execution capability.
The NEP 2030 era will be decided by capability rather than by intent: whether institutions can diagnose their own problems, run a change, measure it, and share what they found. That is a skill set, and skill sets have to be taught to somebody.
Raaj Drishti teaches it to the people who are already inside the system and already committed to it — serving teachers, principals, teacher educators, curriculum designers and policy professionals — rather than importing capability from outside and withdrawing it when a contract ends.
Patiala, Punjab · Pexels
Raaj Drishti is designed as the execution bridge from NEP 2020 to NEP 2030.
Detailed government-facing material — cabinet notes, departmental proposals and state-level submissions — is prepared offline for ministries rather than published here. This page is deliberately light on that detail.
For government
